Working time:Monday - Saturday: 09 AM - 09 PM
+91 7989251662

Find us:F4 1ST FLOOR EurekaCourt Building, Bata Shoroom Lane

PRIMAVERA

Let children creative and make a different

PRIMAVERA

Let children creative and make a different

image not exist
BEST PRIMAVERA TRAINING INSTITUTE IN HYDERABAD

OVERVIEW OF PRIMAVERa

  • Navigation
    • Primavera P6 overview
    • An introduction to Primavera P6
    • Logging In
    • Dashboards, Portfolios, Projects and Resources Tabs
    • Project Workspaces
    • Navigating the Project Pages
    • Chapter summary
  • Project Structures
    • Enterprise Project Structure (EPS)
    • Modifying the EPS
    • Organizational Breakdown Structure (OBS)
    • Chapter summar
  • Project Creation
    • Project creation overview
    • Project Calendars
    • Working with calendars
    • Creating a new project
    • Chapter summary
  • The Work Breakdown Structure
    • Work Breakdown Structure (WBS) overview
    • Defining a WBS
    • Modifying the WBS
    • Chapter summary
  • Adding Activities
    • Activities overview
    • Describing an Activity and its attributes
    • Working with Activity Types
    • Adding Activities
    • Understanding Duration Types
    • Assigning Activity Codes
    • Chapter summary
  • Relationships and Constraints
    • Relationships overview
    • Relationship Types
    • Creating Relationships
    • Performing a Forward and Backward Pass
    • Apply a Constraint to an Activity
    • Critical Path Method
    • Modifying the Project Duration
    • Chapter summary
  • Formatting Project Data
    • Formatting overview
    • Grouping
    • Sorting
    • Filtering
    • Chapter summar
  • Roles and Resources
    • Resources and Roles overview
    • Describing Roles and Resources
    • Assigning Roles to an Activity
    • Assign Rates on Roles
    • Assigning Resources
    • Analyzing Resource Assignments
    • Chapter summary
  • Analysis, Risks and Issues
    • Analysis overview
    • Working with Check Schedule
    • Adjusting the Project Schedule
    • Analyzing Resource Availability
    • Entering Risks
    • Entering Issues
  • Baselines
    • Baselines overview
    • Creating a baseline
    • Working with baselines
    • Chapter summary
  • Progressing the Project
    • Project execution overview
    • Status update methods
    • Using Progress Spotlight
    • Progressing activity status
    • Rescheduling the Project
    • Chapter summary
  • Printing, Publishing, Importing and Exporting
    • Printing and Print Preview
    • Publishing Activities
    • Export and Importing

NEWSLETTER

Subscribe and get the latest news and useful tips, advice and best offer.